Logistics
From the Yangtze Delta to your port.
Departing from Shanghai and Ningbo on FOB, CIF or CFR terms. Transit times are indicative and confirmed at booking.
Routes we run
Port-to-port indicative ranges, excluding clearance and inland transport.
- EuropeCNSHA → NLRTM28–35 d
- North AmericaCNSHA → USNYC22–30 d
- South AsiaCNNGB → INNSA18–24 d
- South East AsiaCNSHA → SGSIN7–12 d
Indicative information — confirmed by contract and batch COA
Where responsibility divides
| Term | Export clearance | Main freight | Insurance | Risk passes |
|---|---|---|---|---|
| FOB | Seller | Buyer | Buyer | On board |
| CFR | Seller | Seller | Buyer | On board |
| CIF | Seller | Seller | Seller | On board |
Document timeline
Booking (10–14 days before shipment) → export clearance (2–3 days before) → bill of lading (3–5 working days after sailing) → arrival notice (3 days before berthing) → clearance (against the bill of lading and commercial invoice). Under an L/C, documents are checked line by line before presentation.
Packaging and marking
Conventional non-hazardous packaging: fibre drums, woven bags with a PE liner, plastic drums. Each drum is marked with product name, CAS number, batch, net weight and production date; pallets are fumigated or made from fumigation-free material as the destination requires. Liquid grades are braced to the carrier's requirement and ship with an SDS.
Document checklist
Prepared per shipment; an L/C governs where one applies.
- COACertificate of analysisIssued per batch, shipped with the goods or emailed after sailing.
- SDSSafety data sheet16-section format for the carrier and destination clearance.
- COOCertificate of originApplied for per shipment, usually issued in 3–5 working days.
- P/LPacking listPackages, gross and net weight and volume, matching the bill of lading and invoice.
- INVCommercial invoiceIssued against the contract or L/C, with matching value and currency.
COA · SDS · COO
Need a CIF price?
Give us the destination port and quantity, and we quote FOB and CIF side by side.